Have architect plans, a floor plan or basement photos? Add them to the estimate form along with the rooms you want and the work you would like priced. Uploads are optional, and you can start a request without drawings.
What happens after you send the form
- Share the project: Tell us your city, the rooms you want and the condition of the basement.
- Clarify the scope: We review your project details and decide case by case whether a site visit is needed before a firm bid.
- Review written pricing: Confirm the work, material allowances, exclusions and permit responsibilities before accepting a proposal.
- Agree on the work: Review the scope, price, schedule and terms in writing before construction starts.
What affects the price of a basement
Knowing which choices affect the scope helps you set priorities before requesting pricing.
| Factor | Why it matters |
|---|---|
| Finished square footage | More area means more framing, drywall, flooring and trim. |
| Number of rooms | Each wall, door and closet adds framing, finishing and electrical. |
| Bathroom or wet bar | Drains, water supply, vents and fixtures can add work, especially when the slab must be opened. |
| Egress windows | Cutting the foundation and installing a window well for a bedroom is a significant line item. |
| Moisture or code fixes | Water management or correcting old work comes before finishes. |
| Ceiling type | Drywall looks finished; a suspended ceiling keeps access but costs differently. |
| Finish level | Flooring, lighting, built-ins, tile and fixtures range widely in price. |
Information that helps with pricing
Start with what you know about the basement. The following details help define the work you want:
- A rough list of the rooms you want, in order of priority.
- Photos or links to basements you like.
- Any history of water in the basement, sump pump trouble or past repairs.
- Radon test results if you have them.
- A working budget range, even a rough one, so we can suggest what fits.
Frequently asked questions about estimates
What happens after I request a basement estimate?
Your project details provide the starting point for reviewing the scope and identifying the next questions. Follow-up may cover the layout, existing conditions, priorities or finish choices. Whether a site visit is needed before a firm bid is decided case by case. Written pricing depends on confirming the work and assumptions for your project, so include any known concerns that could affect the estimate.
What should a written basement estimate include?
A useful estimate lists the work, materials, allowances and exclusions. Depending on the project, that may include demolition, framing, electrical, plumbing, drywall, flooring and permits. Check which finish choices remain open and how changes will be priced. Ask whether each optional upgrade is included in the total or listed separately. Compare bids against the same scope before deciding which proposal fits your needs.
Do I need to know exactly what I want before requesting an estimate?
No. Start with how you want to use the basement and what is there now. List your priorities and any choices you have not made, such as whether to include a bathroom or finish the whole area. A clear request helps identify the questions that need answers before the scope and pricing can be confirmed. You can discuss options without having every finish selected.
Can I upload architect plans for a basement bid?
Yes. Attach architect plans, floor plans, sketches or basement photos to your estimate request. Use PDF, JPG or PNG files within the limits shown on the form. Export CAD drawings as a PDF first. Include the drawing revision you want reviewed and describe any options you would like priced. Files are optional, so you can also begin with a description of the project.
How are my plans used to prepare a written bid?
Plans help describe the layout, rooms and work you want. Pricing also depends on the existing conditions, chosen materials and any details the drawings leave open. Identify your main scope and optional upgrades, then confirm what the written bid includes. Whether a site visit is needed before a firm bid is decided case by case. More information may also be needed to confirm the scope.